See a sample final audit, before you upload yours.

This is what comes back from a scoped drawing audit: the marked sheet, the finding, the sheet references, and the reason it matters before bid or issue.

Results may be held if drawing quality isn’t audit-ready. We don’t promise every upload gets a full pack.

What’s in the pack

  • Bluebeam-ready marked PDF
  • One-page forensic summary with sheet references and finding context
  • Excel/CSV companion for forwarding findings to Precon, VDC, or the project team

The marked sheet and shortened issue log on this page are the sample.

Sample report

Bluebeam-ready findings on the plan: verified marks, missing-from-schedule and wrong-door-material callouts, and the door schedule.

Sample marked floor plan with blue Verified marks, red Missing from Schedule and Wrong Door Material callouts, and a door schedule

Download sample issue log (Excel)

  • Sheet index gap: a sheet is listed in the index but missing from the set.
  • Dead callout: a callout points to a detail that is not present or does not resolve.
  • Door schedule mismatch: the door tag, schedule entry, and plan opening do not agree.

Sample issue log

A shortened companion to the marked sheet: the issue, the sheet, the description, and an estimated rework/risk for review.

Download sample issue log (Excel)

  • Incorrect Reference Detail

    Issue SBI-0001

    Sheet A101 · Page 1

    Callout symbol references a detail that does not exist.

    Estimated rework/risk: $2,000

  • Missing Sheets

    Issue SBI-0002

    Sheet A101 · Page 1

    Sheet A102 is listed in the sheet index but is not included in the set.

    Estimated rework/risk: $500

  • Missing From Schedule

    Issue SBI-0003

    Sheet A101 · Page 1

    Door tag 104 is shown on the plan and has no matching door-schedule row.

    Estimated rework/risk: $5,000

  • Missing From Schedule

    Issue SBI-0004

    Sheet A130 · Page 4

    Door tag 118 on the plan does not appear in the door schedule.

    Estimated rework/risk: $5,000

  • Incorrect Reference Detail

    Issue SBI-0012

    Sheet A131 · Page 5

    Callout symbol references a detail that does not exist.

    Estimated rework/risk: $2,000

  • Missing From Schedule

    Issue SBI-0005

    Sheet A131 · Page 5

    Door tag 203 is tagged on the plan but missing from the door schedule.

    Estimated rework/risk: $5,000

  • Schedule Mismatch

    Issue SBI-0006

    Sheet A132 · Page 7

    Door tag 210 on the plan does not match the width listed in the door schedule.

    Estimated rework/risk: $5,000

  • Missing From Schedule

    Issue SBI-0007

    Sheet A135 · Page 9

    Door tag 221 is on the plan opening and is absent from the door schedule.

    Estimated rework/risk: $5,000

  • Schedule Mismatch

    Issue SBI-0008

    Sheet A140 · Page 14

    Door tag 305 hardware group on the plan does not match the door schedule.

    Estimated rework/risk: $5,000

  • Missing From Schedule

    Issue SBI-0009

    Sheet A147 · Page 21

    Door tag 412 is shown at the corridor and is not on the door schedule.

    Estimated rework/risk: $5,000

  • Schedule Mismatch

    Issue SBI-0010

    Sheet A151 · Page 25

    Door tag 418 fire rating on the plan does not agree with the door schedule.

    Estimated rework/risk: $5,000

  • Missing From Schedule

    Issue SBI-0011

    Sheet A102 · Page 2

    Door tag 109 is on the plan and missing from the door schedule.

    Estimated rework/risk: $5,000

Estimated rework/risk is illustrative marketing framing for typical field/RFI exposure, not a quote or guarantee.

How to read the markups in Bluebeam

Open the marked PDF in Bluebeam, follow the cloud and sheet reference, and resolve the finding in the drawing workflow your team already runs. MarkedUp flags the relationship; your project team remains responsible for the design decision.

ConstructionProof is the drag-and-drop path. It is not a separate drawing system.