Features

Check that every plumbing equipment tag matches the plumbing schedule

A fixture or piece of equipment that is tagged on the plan but missing from the schedule, or scheduled but never shown, can leave scope unpriced. MarkedUp compares plumbing equipment tags on the plans to the schedule, and schedule items back to the tags in the plan areas, and returns each mismatch as a Bluebeam-ready finding.

Why it matters: a tag-to-schedule mismatch can leave plumbing scope unpriced or uncoordinated until the field finds it.

Plumbing sets show the same equipment in two places: the tag on the plan and the row in the schedule. When items are added, renamed or removed late in design, the two drift apart. MarkedUp checks in both directions, tags to schedule and schedule to tags, so every mismatch is flagged with its sheet references before pricing or construction.